Our Process is Simple.

At Honomobo we simplify the build process. Our team will work with you through the process from our initial feasibility consultation through to handing you the keys to your new Honomobo every step of the way.

Our process varies slightly depending on the Province that you plan on having your Honomobo installed. Expand the links below to review the process of planning and purchasing a Honomobo Home.

+ Alberta and British Columbia

Step 1 - Feasibility Consultation (2 Options Available)

The first step in order to see if a Honomobo will work for you and your property is to start a feasibility assessment.

Option 1 (No Site Visit)

If you feel confident that your property will not have any issues in regards to a flatbed truck (up to 72ft in length) and crane accessing within 30ft of the desired building location, we suggest going with a

No Site Visit - Feasibility Assessment.

  • Phone Consultation with our inside sales team
  • Zoning Verification
  • Upgrade Option Pricing
  • Budgetary Estimate for the Honomobo, shipping, crane work and on-site installation
  • Cost of this is $495

Option 2 (Site Visit)

If you are uncertain that your property will not have any issues in regards to a flatbed truck (up to 72ft in length) and crane accessing within 30ft of the desired building location, we suggest going with a Site Visit - Feasibility Assessment. Below is a list of what is included:

  • Phone Consultation with our inside sales team
  • Site Visit by Honomobo to determine overhead crane clearance and truck accessibility
  • Review building location, orientation, foundation options and site-specific requirements
  • Zoning Verification
  • Upgrade Option Pricing
  • Budgetary Estimate
  • Cost is quoted per project

Step 2 - Design and Engineering We will provide you with an architectural drawing package and foundation engineering for permit submission. We have two options available:

Option 1: Permit Drawings and Basic Foundation Engineering (Perimeter Foundation)

  • Architectural Drawing Set $4,750
  • Basic Foundation Engineering $2,500+

Option 2: Custom Permit Drawing and Custom Foundation Engineering (Garage/Suite Foundation)

  • Design Brief and Proposal
  • Concept Design
  • Architectural Drawing Set
  • Custom Foundation Engineering
  • Price is quoted per project

Step 3 - 5% Reservation Deposit

This deposit, 5% of the Honomobo price, will hold a production spot for 6 months from time of payment. The remaining Construction Deposit is due 75 days from the production start date.

Step 4: Permit Submittals

Once all architectural, engineering and certification documentation is complete, all drawings and accompanying documentation are compiled and can be submitted for Building Permits.

Step 5: Production and 50% Progress Payment – Site Work Starts

At key stages of construction, we will provide updates and pictures of your Honomobo.

Your local contractor begins site preparation and foundation work.

The 50% Manufacturing Progress Payment is due upon completion of the structural frame and prior to the start of: Module complexing, Mechanical/Electrical/Plumbing rough-in, insulation, drywall, paint and interior finishing.

Step 6: Completion of your Honomobo

Once we have performed our final walkthrough checks on your Honomobo, we will send pictures prior to wrapping the modules for delivery or storage.

If your site is not ready for delivery 30 days after our final walkthrough, we will provide a monthly storage payment plan until your site is ready.

30 days prior to scheduled shipping date, we will provide updated shipping, crane and installation estimates - Due 15 days prior to actual shipping date.

Step 7: Delivery and Onsite Installation

Once we confirm that your site is ready to receive your Honomobo, we then book the crane, trucks and send the Honomobo installation team to your site.

Once onsite, the Honomobo Installation Team coordinates with the Crane Operator to land the individual modules onto the foundation and complete the Honomobo installation (Approximately 7 days depending on the Honomobo model and scope of work).

Site utilities are then connected to the home once the modules have landed and have been welded to the foundation.

Step 8: Final 10%

The Final 10% Payment is to be held in Trust with Honomobo’s lawyers, Emery Jamieson LLP, and is to be provided at the same time as the 50% Manufacturing Progress Payment. It will be released upon Walk Through Sign Off by Customer, less any deficiencies identified.

Step 9: Decks, railings, stairs etc. are completed by your contractor

Step 10 - Move into your Honomobo!!

+ Ontario

Step 1 - Feasibility Consultation (2 Options Available)

The first step in order to see if a Honomobo will work for you and your property is to start a feasibility assessment.

Option 1 (No Site Visit)

If you feel confident that your property will not have any issues in regards to a flatbed truck (up to 72ft in length) and crane accessing within 30ft of the desired building location, we suggest going with a

No Site Visit - Feasibility Assessment.

  • Phone Consultation with our inside sales team
  • Zoning Verification
  • Upgrade Option Pricing
  • Budgetary Estimate for the Honomobo, shipping, crane work and on-site installation
  • Cost of this is $495

Option 2 (Site Visit)

If you are uncertain that your property will not have any issues in regards to a flatbed truck (up to 72ft in length) and crane accessing within 30ft of the desired building location, we suggest going with a Site Visit - Feasibility Assessment. Below is a list of what is included:

  • Phone Consultation with our Ontario Dealer
  • Site Visit by Honomobo to determine overhead crane clearance and truck accessibility
  • Review building location, orientation, foundation options and site-specific requirements
  • Zoning Verification
  • Upgrade Option Pricing
  • Budgetary Estimate
  • Cost is quoted per project

Step 2 - Design and Engineering We will provide you with an architectural drawing package and foundation engineering for permit submission. We have two options available:

Option 1: Permit Drawings and Basic Foundation Engineering (Perimeter Foundation)

  • Architectural Drawing Set $4,750
  • Basic Foundation Engineering $2,500+

Option 2: Custom Permit Drawing and Custom Foundation Engineering (Garage/Suite Foundation)

  • Design Brief and Proposal
  • Concept Design
  • Architectural Drawing Set
  • Custom Foundation Engineering
  • Price is quoted per project

Step 3 - 5% Reservation Deposit

This deposit, 5% of the Honomobo price, will hold a production spot for 6 months from time of payment. The remaining Construction Deposit is due 75 days from the production start date.

Step 4: Permit Submittals

Once all architectural, engineering and certification documentation is complete, all drawings and accompanying documentation are compiled and can be submitted for Building Permits.

Step 5: Production and 50% Progress Payment – Site Work Starts

At key stages of construction, we will provide updates and pictures of your Honomobo.

Jason McLean begins site preparation and foundation work.

The 50% Manufacturing Progress Payment is due upon completion of the structural frame and prior to the start of: Module complexing, Mechanical/Electrical/Plumbing rough-in, insulation, drywall, paint and interior finishing.

Step 6: Completion of your Honomobo

Once we have performed our final walkthrough checks on your Honomobo, we will send pictures prior to wrapping the modules for delivery or storage.

If your site is not ready for delivery 30 days after our final walkthrough, we will provide a monthly storage payment plan until your site is ready.

30 days prior to scheduled shipping date, we will provide updated shipping, crane and installation estimates - Due 15 days prior to actual shipping date.

Step 7: Delivery and Onsite Installation

Once we confirm that your site is ready to receive your Honomobo, we then book the crane, trucks and send the Honomobo installation team to your site.

Once onsite, the Honomobo Installation Team coordinates with the Crane Operator to land the individual modules onto the foundation and complete the Honomobo installation (Approximately 7 days depending on the Honomobo model and scope of work).

Site utilities are then connected to the home once the modules have landed and welded to the foundation.

Step 8: Final 10%

The Final 10% Payment is to be held in Trust with Honomobo’s lawyers, Emery Jamieson LLP, and is to be provided at the same time as the 50% Manufacturing Progress Payment. It will be released upon Walk Through Sign Off by Customer, less any deficiencies identified.

Step 9: Decks, railings, stairs etc. are completed by your contractor

Step 10 - Move into your Honomobo!!