Review placement, orientation, foundation type, styling, budget, project goals
Zoning Verification
3D Render Package
1 Revision included
Design and Engineering Proposal to move onto Step 3
Steps
Pay for the Schematic Design
Once we have received payment, your Salesperson will be in touch within 24 hours to send you the receipt, a checklist to outline the styling options for the Honomobo unit of your choosing, and to arrange the design brief call.
Site-Specific Reports:
Please have all Site-specific reports ready, if available, to give to your Sales Person. (Ex. Survey, Geotechnical (soils), Environmental etc.)
In order for us to complete the Schematic Design, we will need to have a copy of your site survey in CAD File Format
After the design brief is complete, we will provide you with a 3D render package of your project within 3 weeks and a design and engineering proposal to move onto the next step of the process (Design and Engineering).